Please use this identifier to cite or link to this item: https://repositorio.inpa.gov.br/handle/1/37796
Title: Impacts of an amazonian hydroelectric dam on frog assemblages
Authors: Dayrell, Jussara Santos
Magnusson, William Ernest
Bobrowiec, Paulo Estefano Dineli
Lima, Albertina Pimentel
Keywords: Animal experiment
Animal tissue
Anura
Issue Date: 2021
metadata.dc.publisher.journal: PLoS ONE
metadata.dc.relation.ispartof: Volume 16 Número e0244580
Abstract: About 90% of the Amazon's energy potential remains unexploited, with many large hydroelectric dams yet to be built, so it is important to understand how terrestrial vertebrates are affected by reservoir formation and habitat loss. We investigated the influence of the construction of the Santo Antônio Hydroelectric dam on the Madeira River in southwestern Amazonia on the structure of frog assemblages based on samples collected in two years before the dam flooded (pre-stage) and one (post1-stage) and four years (post2-stage) after its construction. We surveyed five 500-ha plot systems three times during each stage; in the pre-stage we sampled 19 plots in low-lying areas that would be flooded by the dam, (from now called flooded pre-stage plots) and 45 plots in terra-firme forest (from now called unflooded pre-stage plots). At the post1-stage we sampled the 45 unflooded plots and in the post2-stage we sampled the remaining 39 unflooded plots. We detected frogs by active visual and acoustic searches standardized by both time and sampling area. Few species recorded in the pre-stage flooded plots were not found in the pre-stage unflooded plots or in stages after flooding. However, the composition of frog assemblages based on relative densities in flooded pre-stage plots did not re-establish in plots on the new river margins. In unflooded areas, frog assemblages were distinct among the flooding stages with no tendency to return to the original assemblage compositions even four years after the dam was filled. For the areas that were not flooded, there was an increase in species richness in 82% of the plots between the surveys before dam construction and the first surveys after dam completion, and 65% between the pre-stage and surveys four years after dam completion. Lack of understanding by the controlling authorities of the long-term effects of landscape changes, such as water-table rises, means that studies covering appropriate periods post construction are not required in legislation, but the data from Santo Antônio indicate that changes due to dam construction are either long-term or difficult to distinguish from natural fluctuations. Future environmental-impact studies should follow strict BACI designs. © 2021 Dayrell et al. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
metadata.dc.identifier.doi: 10.1371/journal.pone.0244580
Appears in Collections:Artigos
IPUB

Files in This Item:
File Description SizeFormat 
Impacts.pdf59,49 kBAdobe PDFView/Open