Please use this identifier to cite or link to this item: https://repositorio.inpa.gov.br/handle/1/40110
Title: Paxyodon syrmatophorus (MEUSCHEN, 1781) (Mollusca, Bivalvia, Unionoida) in the Curuá-Una reservoir, Santarém, Pará, Brazil
Authors: Mansur, M. C. Dreher
Ribeiro, C. Volkmer
Carvalho, J. Lopes de
Keywords: Usina Hidrelétrica
Issue Date: 1997
metadata.dc.publisher.journal: Amazoniana
metadata.dc.relation.ispartof: Volume 14, fascículo 3/4, 1997, página 349-351
Abstract: The Curuá-Una hydroelectric power plant which dams the river of the same name was the first to be constructed in the Amazon Basin. The project of this plant was not based on a study on environmental impact which was not required at the time. Therefore, no survey on the biota of the river was performed before the contruction or even on the occasion of the closing of the sluice-gates for the formation of the lake whose filling was completed on April 30. 1977.
Appears in Collections:Fascículo 3/4 , Ano 1997

Files in This Item:
File SizeFormat 
p_349_351.pdf868,83 kBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons