Use este identificador para citar ou linkar para este item: https://repositorio.inpa.gov.br/handle/1/40110
Registro completo de metadados
Campo DCValorIdioma
dc.contributor.authorMansur, M. C. Dreher-
dc.contributor.authorRibeiro, C. Volkmer-
dc.contributor.authorCarvalho, J. Lopes de-
dc.date.accessioned2023-12-11T19:22:44Z-
dc.date.available2023-12-11T19:22:44Z-
dc.date.issued1997-
dc.identifier.urihttps://repositorio.inpa.gov.br/handle/1/40110-
dc.description.abstractThe Curuá-Una hydroelectric power plant which dams the river of the same name was the first to be constructed in the Amazon Basin. The project of this plant was not based on a study on environmental impact which was not required at the time. Therefore, no survey on the biota of the river was performed before the contruction or even on the occasion of the closing of the sluice-gates for the formation of the lake whose filling was completed on April 30. 1977.pt_BR
dc.language.isoenpt_BR
dc.relation.ispartofVolume 14, fascículo 3/4, 1997, página 349-351pt_BR
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/br/*
dc.subjectUsina Hidrelétricapt_BR
dc.titlePaxyodon syrmatophorus (MEUSCHEN, 1781) (Mollusca, Bivalvia, Unionoida) in the Curuá-Una reservoir, Santarém, Pará, Brazilpt_BR
dc.typeArtigopt_BR
dc.publisher.journalAmazonianapt_BR
Aparece nas coleções:Fascículo 3/4 , Ano 1997

Arquivos associados a este item:
Arquivo TamanhoFormato 
p_349_351.pdf868,83 kBAdobe PDFVisualizar/Abrir


Este item está licenciada sob uma Licença Creative Commons Creative Commons