Use este identificador para citar ou linkar para este item:
https://repositorio.inpa.gov.br/handle/1/40110
Registro completo de metadados
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.author | Mansur, M. C. Dreher | - |
dc.contributor.author | Ribeiro, C. Volkmer | - |
dc.contributor.author | Carvalho, J. Lopes de | - |
dc.date.accessioned | 2023-12-11T19:22:44Z | - |
dc.date.available | 2023-12-11T19:22:44Z | - |
dc.date.issued | 1997 | - |
dc.identifier.uri | https://repositorio.inpa.gov.br/handle/1/40110 | - |
dc.description.abstract | The Curuá-Una hydroelectric power plant which dams the river of the same name was the first to be constructed in the Amazon Basin. The project of this plant was not based on a study on environmental impact which was not required at the time. Therefore, no survey on the biota of the river was performed before the contruction or even on the occasion of the closing of the sluice-gates for the formation of the lake whose filling was completed on April 30. 1977. | pt_BR |
dc.language.iso | en | pt_BR |
dc.relation.ispartof | Volume 14, fascículo 3/4, 1997, página 349-351 | pt_BR |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/br/ | * |
dc.subject | Usina Hidrelétrica | pt_BR |
dc.title | Paxyodon syrmatophorus (MEUSCHEN, 1781) (Mollusca, Bivalvia, Unionoida) in the Curuá-Una reservoir, Santarém, Pará, Brazil | pt_BR |
dc.type | Artigo | pt_BR |
dc.publisher.journal | Amazoniana | pt_BR |
Aparece nas coleções: | Fascículo 3/4 , Ano 1997 |
Arquivos associados a este item:
Arquivo | Tamanho | Formato | |
---|---|---|---|
p_349_351.pdf | 868,83 kB | Adobe PDF | Visualizar/Abrir |
Este item está licenciada sob uma Licença Creative Commons